{"id":335032,"date":"2025-09-27T10:42:34","date_gmt":"2025-09-27T10:42:34","guid":{"rendered":"https:\/\/alertindianews.in\/?p=335032"},"modified":"2025-09-27T10:42:34","modified_gmt":"2025-09-27T10:42:34","slug":"mumbai-ahmedabad-bullet-train-to-be-operational-by-2029-surat-bilimora-section-ready-by-2027","status":"publish","type":"post","link":"https:\/\/alertindianews.in\/?p=335032","title":{"rendered":"Mumbai-Ahmedabad Bullet Train To Be Operational By 2029, Surat-Bilimora Section Ready By 2027"},"content":{"rendered":"
The Mumbai-Ahmedabad bullet train will be operational by 2029, and the 50-km stretch of India’s first high-speed rail corridor between Surat and Bilimora in Gujarat is expected to open by 2027, Union Railways Minister Ashwini Vaishnaw said<\/p>\n
\u200bThe Mumbai-Ahmedabad bullet train will be operational by 2029, and the 50-km stretch of India’s first high-speed rail corridor between Surat and Bilimora in Gujarat is expected to open by 2027, Union Railways Minister Ashwini Vaishnaw said\u00a0\u00a0<\/p>","protected":false},"excerpt":{"rendered":"
The Mumbai-Ahmedabad bullet train will be operational by 2029, and the 50-km stretch of India’s first high-speed rail<\/p>\n","protected":false},"author":0,"featured_media":335033,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-335032","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"aioseo_notices":[],"aioseo_head":"\n\t\t\n\t\n\t\n\t\n\t\n\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t