{"id":303106,"date":"2025-09-01T17:33:09","date_gmt":"2025-09-01T17:33:09","guid":{"rendered":"https:\/\/alertindianews.in\/?p=303106"},"modified":"2025-09-01T17:33:09","modified_gmt":"2025-09-01T17:33:09","slug":"video-7-km-traffic-jam-on-gurugram-highway-vehicles-stuck-for-over-3-hours","status":"publish","type":"post","link":"https:\/\/alertindianews.in\/?p=303106","title":{"rendered":"Video: 7-km Traffic Jam On Gurugram Highway, Vehicles Stuck For Over 3 Hours"},"content":{"rendered":"

With cars queuing almost bumper-to-bumper, the traffic jam on the Delhi-Jaipur highway stretched up to 7-8 kilometres and people were stuck for over 3 hours after heavy rain hit Gurugram Monday, throwing normal life out of gear.<\/p>\n

\u200bWith cars queuing almost bumper-to-bumper, the traffic jam on the Delhi-Jaipur highway stretched up to 7-8 kilometres and people were stuck for over 3 hours after heavy rain hit Gurugram Monday, throwing normal life out of gear.\u00a0\u00a0<\/p>","protected":false},"excerpt":{"rendered":"

With cars queuing almost bumper-to-bumper, the traffic jam on the Delhi-Jaipur highway stretched up to 7-8 kilometres and<\/p>\n","protected":false},"author":0,"featured_media":303107,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-303106","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"aioseo_notices":[],"aioseo_head":"\n\t\t\n\t\n\t\n\t\n\t\n\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t